LOCATION:
Brampton ON
GROSS AREA:
545,000 sf (50,632 sm) - Best Buy
440,000 sf (40,877 sm) - Future Shop
COMPLETION DATE:
June 2004 - Best Buy
November 2001 - Future Shop
|
|
|
|
To service their newly established retail outlets in Ontario, Quebec and Eastern Canada
and to coordinate distribution services with Future Shop division, Best Buy Canada Ltd. required a new facility to expand their Brampton Distribution Centre to provide a total of
1,000,000 sf of warehouse and 130 dock positions.
Hopewell Development Corporation engaged Giffels to develop a solution which twinned the Future Shop facility (also constructed by Giffels Design-Build and completed in 2001). An elevated conveyor bridge was incorporated to facilitate stock transfer between the two warehouse and distribution facilities and to provide a common courtyard shipping/
receiving dock area and security control point.
As part of a total service package Giffels was retained by Best Buy to manage the
installation of their complete tenant fit up needs including automated conveying and loading systems, racking systems, pick towers, energy conserving lighting systems, offices and staff facilities. |