November  20, 2008      
 
 
     
LOCATION:
Brampton ON

GROSS AREA:
302,700 sq. ft.

COMPLETION DATE:
April 2002
   
Nestlé Canada Inc. selected The Hopewell Group of Companies to provide a turnkey solution for a new national distribution centre. The new facility is located at Airport Road and Highway 7 in Brampton. To accommodate Nestlé’s requirements, Giffels was engaged by Hopewell to construct a distribution facility, including 262,700 sq. ft. of temperature-controlled space and a 40,000 sq. ft. office area.

The facility is insulated precast clad, with a clear height of 30 ft. and an ESFR sprinkler system to allow maximum flexibility in product storage. The site is utilized to its maximum efficiency to provide a ring road, extensive parking and rear yard trailer storage area. To accommodate Nestlé and Hopewell’s commitment to commence operations in early 2002, this large project was fast-tracked and delivered within a nine month schedule.
 
 
Search     
       
  Design-Build  
    Construction  
          Warehouse
Norelco Road
Best Buy
Future Shop
Sears Canada-Vaughan
Sears Canada-Calgary
CINRAM
Hopewell Nestles
Smart Technologies
The Brick
UAP/NAPA
 
        Industrial  
        Specialty  
        Office  
    Partnership Solutions  
    Turnkey Interiors  
  Development  
       
 
FACILITATING COMPETITIVE ADVANTAGE
 
CALGARY ARCHITECTURAL FIRM GOES GLOBAL WITH NEW DEAL
 
USING INNOVATIVE ENGINEERING
 

   © 2008 Ingenium Group   |   Site Map   |   News   |  Clients   |  Disclaimer |  RSS
Ingenium      NORR     Cion    PMA